EN

Branch office «Universalbank»

Ivano-Frankivsk region, Vilda Str. 2

Completed in — 2008

Floor area: 320 sq. m.

The repair and construction work fulfilled:

  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • installation of floor cement covering;
  • wall and floor lining with ceramic and ceramic granite tiles;
  • laying of internal systems of water supply, sewerage, internal systems of power supply and heating;
  • laying of internal systems of ventilation and air conditioning.
  • Performance time: 5 months


© 2006—2011 Energobud