Zhytomyr region, 11-B Zhovtneva St., Korosten, Zhytomyr region
Completed in — 2011
Floor area: 42 hectares
The repair and construction work fulfilled:
earthwork operations;
installation of monolithic reinforced-concrete foundation for the compression apparatus of the main engineering building;
installation of monolithic reinforced-concrete foundation for the defibrator;
assemblage of column, beam, truss metal structures;
the arrangement of through tunnels 1, 2 of the main production complexes;
the arrangement of communication channels between the main press and the through tunnels 1, 2;
the arrangement of the monolithic foundation for the work with rubbing machine and diagonal saw;
the arrangement of the foundation plates, beam and columns of the laying-up shop;
the mounting of the metalwares, columns and girders;
the arrangement of the monolithic ferroconcrete foundations of the power generating unit for building and equipment;
the arrangement of the monolithic-frame part of the administrative-domestic building (ADB);
civil and erection works of ADB, inner and outer finishing work of ADB, the installation of inner networks of ADB;
the arrangement and the mounting of inner and outer walling of ADB;
the arrangement of crushed stone and concrete preparation, the arrangement of surface proofer with polymeric materials of ferroconcrete constructions;
the arrangement of of the monolithic ferroconcrete foundations, foundation beams, socle of wooden fibre preparation shop;
the arrangement of the monolithic ferroconcrete foundations, foundation beams of bark shop;
the arrangement of walling of the wooden fibre preparation shop;
the arrangement of the civil and erection and finishing works of the wooden fibre preparation shop;
the arrangement of the foundations, foundation beams, socle of the main production complex (MPC);
the arrangement of the monolithic concrete industrial floor:
- of main press,
- of through tunnels 1, 2,
-of building of bark shop,
- of the wooden fibre preparation shop,
- of the power generating unit;
the arrangement of the monolithic ferroconcrete foundation for trestle:
- electric grid,
- termooil feed,
- of bark shop,
- of the power generating unit,
the arrangement of crushed stone and concrete preparation of the monolithic stairs and of the monolithic electric dry area of the administrative domestic unit
the arrangement of crushed stone and concrete of CPDV;
the arrangement of crushed stone and concrete of the foundation of the gallery of spalok Fm-1;
the arrangement of crushed stone and concrete of the foundation of the gallery of the electric cable;
the fabrication of the frameworks and binding of the reinforcement of the gallery of the electric cable;
concrete casting of the shop of preparation of wood fibre;
the arrangement of the foundation and floor, binding frameworks of power unit;