Electromembrane process of caustic soda plant

Ivano-Frankivsk region, 29 Robytnycha str., v. Mostyshe, Kalush

Completed in — 2010

Floor area: 6162 sq. m; total structural volume 113309 cubic metersm; capacity 200 thous. ton per year.

Employer: governmental enterprise "Karpatnaftokhim" (OJSC "Lukor").

The repair and construction work fulfilled:

  • earthwork operations;
  • installation of monolithic reinforced-concrete foundation;
  • installation of the tunnel at level -8,0;
  • installation of monolithic reinforced-concrete column, beam and floor systems assemblage of column, beam, truss metal structures;
  • installation of monolithic concrete manufacturing flooring.
Performance time: 9 months (October 2007 - June 2008).