EN

Shopping Center "Polex"

Chernivtsi, 207-А Rus’ka Str.

Completed in — 2008

Floor area: 1900 sq. m

The repair and construction work fulfilled:

  • earthwork operations;
  • installation of monolithic reinforced-concrete foundation;
  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • construction of brickwork, brick walls, partitions;
  • assemblage of roofwork and woodwork constructions;
  • exterior and interior finishing;
  • laying of the internal systems of sewerage and water supply, weak-current circuits, internal systems of electricity and heating.
Performance time: six months.




© 2006—2011 Energobud