Construction / Customers
EN
ph.:
Th38Reconstruction of the school building I-II degree for kindergarten 2011

Floor area: 1003,7 sq. m.

Planned work:

  • landscaping of the adjacent territory;
  • civil and erection works;
  • excavation works;
  • finishing works;
  • protection of building structures and equipment from corrosion;
  • installation of metal structures;
  • external networks (water, sewerage, heating, gas);
  • insulation work;
  • internal plumbing work;
  • installation of fans;
  • installation louvre gratings;
  • lining ducts from sheet steel;
  • installation of chimney and ventilation pipe ;
  • installation of heating boilers;
  • installation of water heaters;
  • the laying of steel pipes to farms and columns;
  • compaction with pneumatic rammers;
  • electric lighting of buildings and electrical work;
  • disassembly of the roof coverings of sheets of corrugated asbestos-cement, masonry walls made of ordinary bricks, rubble foundations without purification.

    period of execution of works — 6 months.

ph.: +38 (044) 503-35-06
Th39Hotel and office complex Hilton2011

Floor area:8500 м2.

The repair and construction work fulfilled:

  • installation of monolithic reinforced-concrete foundation

ph.: (044) 482-34-13
ph.:
Th53Биогазовая установка для производства електроэнергии2012

Общая площадь: 45246 м2.

Площадь застройки: 23057 м2.

Запланированные работы:

  • земляные работы;
  • підготовка площадки для строительства – устройство щебневой подготовки;
  • бетонирование конструкций ёмкостей для сырья;
  • монтаж оборудования когенерационных установок;
  • теплоизоляционные работы;
  • монтаж конструкций внешней отделки;
  • монтаж установок для ввода твёрдого сырья;
  • установка ферментаторов;
  • монтаж автомобильных весов;
  • электромонтажные работы;
  • благоустройство прилегающей территории;
  • устройство подъездных дорог;
  • устройство ограждения территории.
Срок выполнения работ: 5 месяцев

"Danosha" Ltd.
1 Lisova Str., Kopanky village, Kalush, Ivano-Frankivsk region
ph.: (03472) 6-24-15, 6-02-74
Th30Pig complex "Danosha" 2009

Floor area: 6400 sq. m

The repair and construction work fulfilled:

  • earthwork operations;
  • installation of monolithic reinforced-concrete foundation;
  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • assemblage of roofwork and woodwork constructions;
  • exterior and interior finishing;
  • laying of the internal systems of sewerage and water supply, weak-current circuits, internal systems of electricity and heating.
Performance time: four months.

"European Construction Technologies" Ltd.
24 O. Kobylyans’ka Str., 36 A, Ivano-Frankivsk
ph.: (0342) 71-57-20
Th25Housing Estate with Underground Parking2008

Floor area: 15000 sq. m.

The repair and construction work fulfilled:

  • earth work;
  • erection of protection constructions;
  • installation of monolithic reinforced-concrete foundation;
  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • construction of brickwork, brick walls, partitions;
  • erection of roofwork and woodwork constructions;
  • installation of energy-efficient windows and balcony doors;
  • assemblage of internal circuit, power supply, water supply, sewerage and heating;
  • floor construction, wall and floor lining with ceramic tiles.
Performance time: 13 months (November 2008 - November 2009).

7-А Kalush highway, Uhryniv village, Tysmenytsya district, Ivano-Frankivsk region
ph.: (0342) 77-35-35
Th21The Hotel of the Recreation Complex "The Black Castle" 2007

Floor area: 1500 sq. m

The repair and construction work fulfilled:

  • earthwork operations;
  • assemblage of reinforced-concrete foundation precast;
  • assemblage of reinforced-concrete floor construction precast;
  • erection of brick walls and partitions;
  • assemblage of roofwork and woodwork constructions;
  • exterior and interior finishing;
  • laying of the internal systems of sewerage and water supply, weak-current circuits, internal systems of electricity and heating.
Performance time: five months.

38 Nezalezhnosti Str., Yaremche, Nadvirna district, Ivano-Frankivsk region
ph.: (03434) 2-45-97
Th22Sanatorium "Pervotsvit"2007

Floor area: 700 sq. m

The repair and construction work fulfilled:

  • installation of floor cement covering;
  • wall and floor lining with ceramic and ceramic granite tiles;
  • plasterboard works (walls, partitions);
  • installation of suspended ceilings from Armstrong tiles;
  • filling with putting, walls and ceiling painting;
  • laying of internal systems of water supply, sewerage, internal systems of power supply and heating.
Performance time: three months.

"Phoenix Invest" Ltd.
6/22 Teatralna St., Chernivtsi
ph.: (03725) 59-20-81
Th26Housing Estate with Underground Parking2008

Floor area: 11000 sq. m

The repair and construction work fulfilled:

  • installation of monolithic reinforced-concrete foundation;
  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • construction of brickwork, brick walls, partitions;
  • installation of energy-efficient windows and balcony doors;
  • installation of the parking concrete floor.
Performance time: 9 months (November 2007 - June 2008).

"Stanislav Trade Company" Ltd.
194 Rus’ka St., Chernivtsi
ph.: (0372) 23-56-78
Th13Supermarket "Favorite"2006

Floor area: 1800 sq. m

The repair and construction work fulfilled:

  • installation of floor cement covering;
  • wall lining with ceramic tiles, floor lining with ceramic granite tiles;
  • plasterboard works (walls, partitions);
  • installation of suspended ceilings from Armstrong tiles;
  • filling with putting, walls and ceiling painting;
  • laying of internal systems, power supply, water supply, sewerage and heating;
  • installation of ventilation and air conditioning system.
Performance time: five months.

51 Holovna Str., Chernivtsi
ph.: (0372) 57-75-29
Th8The Regional Branch of "TAS-Kommerzbank" JSCB2007

Floor area: 1500 sq. m

The repair and construction work fulfilled:

  • installation of floor cement covering;
  • wall and floor lining with ceramic granite tiles;
  • plasterboard works (walls, partitions);
  • installation of suspended ceilings from Armstrong tiles;
  • filling with putting, walls and ceiling painting;
  • laying of internal systems, power supply, water supply, sewerage and heating;
  • installation of ventilation and air conditioning systems.
Performance time: three months.

«Art Progress» Ltd.
38 Yaroslaviv Val str., Kyiv
ph.: (044) 496-85-72, 496-85-83
Th35MDF production plant2011

Floor area: 42 hectares

The repair and construction work fulfilled:

  • earthwork operations;
  • installation of monolithic reinforced-concrete foundation for the compression apparatus of the main engineering building;
  • installation of monolithic reinforced-concrete foundation for the defibrator;
  • assemblage of column, beam, truss metal structures;
  • the arrangement of through tunnels 1, 2 of the main production complexes;
  • the arrangement of communication channels between the main press and the through tunnels 1, 2;
  • the arrangement of the monolithic foundation for the work with rubbing machine and diagonal saw;
  • the arrangement of the foundation plates, beam and columns of the laying-up shop;
  • the mounting of the metalwares, columns and girders;
  • the arrangement of the monolithic ferroconcrete foundations of the power generating unit for building and equipment;
  • the arrangement of the monolithic-frame part of the administrative-domestic building (ADB);
  • civil and erection works of ADB, inner and outer finishing work of ADB, the installation of inner networks of ADB;
  • the arrangement and the mounting of inner and outer walling of ADB;
  • the arrangement of crushed stone and concrete preparation, the arrangement of surface proofer with polymeric materials of ferroconcrete constructions;
  • the arrangement of of the monolithic ferroconcrete foundations, foundation beams, socle of wooden fibre preparation shop;
  • the arrangement of the monolithic ferroconcrete foundations, foundation beams of bark shop;
  • the arrangement of walling of the wooden fibre preparation shop;
  • the arrangement of the civil and erection and finishing works of the wooden fibre preparation shop;
  • the arrangement of the foundations, foundation beams, socle of the main production complex (MPC);
  • the arrangement of the monolithic concrete industrial floor:
  • - of main press,
  • - of through tunnels 1, 2,
  • -of building of bark shop,
  • - of the wooden fibre preparation shop,
  • - of the power generating unit;
  • the arrangement of the monolithic ferroconcrete foundation for trestle:
  • - electric grid,
  • - termooil feed,
  • - of bark shop,
  • - of the power generating unit,
  • the arrangement of crushed stone and concrete preparation of the monolithic stairs and of the monolithic electric dry area of the administrative domestic unit
  • the arrangement of crushed stone and concrete of CPDV;
  • the arrangement of crushed stone and concrete of the foundation of the gallery of spalok Fm-1;
  • the arrangement of crushed stone and concrete of the foundation of the gallery of the electric cable;
  • the fabrication of the frameworks and binding of the reinforcement of the gallery of the electric cable;
  • concrete casting of the shop of preparation of wood fibre;
  • the arrangement of the foundation and floor, binding frameworks of power unit;
  • laying-up implementation (plates PF3, PF4, PF5, PF6);
  • the implementation of compressor brick setting;
  • the arrangement of crushed stone and concrete SH-3,SH-4;
  • the arrangement of crushed stone and concrete of the foundation GPK;
  • the arrangement of concrete wall of the GPK on the axe B 21-24;
  • the fabrication of the frameworks and binding of the reinforcement GPK;
  • the arrangement of the concrete in FOm3,FOm4,FOm5,FOm6, FOm10;
  • concrete casting of anchor blocks;
  • the arrangement of the foundation of CMS;
  • the arrangement of the metal constructions of CMS;
  • the arrangement of the floor of the CMS;
  • construction of sewage rainwater cleaning structure;
  • construction of TP and compressor station.
Performance time: 12 months (June 2009— June 2010).

Th37Hotel and Office center2010

Floor area: 6400 sq. m

The repair and construction work fulfilled:

  • installation of walls of plasterboard;
  • wall and floor lining with ceramic granite tiles;
  • plasterboard works (walls, partitions);
  • installation of suspended ceilings from Armstrong tiles;
  • filling with putting, walls and ceiling painting.
Performance time: four months.

179 Getman Mazepa str., Ivano-Frankivsk
ph.: (0342) 55-96-30, (0342) 55-94-31
Th27Villa Community "Castle Estate" 2008

Floor area: 5800 sq. m.

The repair and construction work fulfilled:

  • full complex of earthwork operations;
  • assemblage of reinforced-concrete foundation precast;
  • assemblage of reinforced-concrete floor construction precast;
  • construction of brickwork, brick walls, partitions;
  • erection of roofwork and woodwork constructions;
  • laying of the external systems of sewerage and water supply, electricity and gas supply, weak-current systems;
  • laying of the internal systems of sewerage and water supply, weak-current circuits, internal systems of electricity and heating;
  • exterior and interior finishing ‘key ready’;
  • landscaping.
Performance time: Groundbreaking: I quarter of 2010.

Th34Business center "Montecristo" 2009

Floor area: 1500 sq. m

The repair and construction work fulfilled:

  • interior alterations;
  • attic addition;
  • erection of brick walls and partitions;
  • assemblage of roofwork and woodwork constructions;
  • front winterization, exterior and interior finishing;
  • laying of the internal systems of sewerage and water supply, weak-current circuits, internal systems of electricity and heating;
  • creation of living environment and adherent territory enclosure.
Performance time: five months.

11 Sichovyh Striltsiv str., Ivano-Frankivsk
ph.: (0342) 55-70-10
Th9The Branch of "ProCreditBank" Commercial bank2008

Floor area: 350 sq. m

The repair and construction work fulfilled:

  • installation of floor cement covering;
  • wall and floor lining with ceramic granite tiles;
  • plasterboard works (walls, partitions);
  • installation of suspended ceilings from Armstrong tiles;
  • filling with putting, walls and ceiling painting;
  • laying of internal circuits, power supply, water supply, sewerage and heating;
  • installation of ventilation and air conditioning systems.
Performance time: two months.

Bolekhiv State Forestry Enterprise
19 Nezalezhnosti Str., Bolekhiv, Ivano-Frankivsk region
ph.: (03437) 29-654
Th18Bolekhiv State Forestry Enterprise 2007

Floor area: 4000 sq. m

The repair and construction work fulfilled:

  • installation of floor cement covering;
  • wall and floor lining with ceramic tiles;
  • plasterboard works (walls, partitions);
  • installation of suspended ceilings from Armstrong tiles;
  • filling with putting, walls and ceiling painting;
  • laying of the internal systems of sewerage, water supply as well as internal systems of electrical supply.
Performance time: seven months.

CE "Zhitlovyk"
19 Shevchenko Str., Burshtyn, Ivano-Frankivsk region
ph.: (03438) 35-231
48 Nezalezhnosti Str., Ivano-Frankivsk
ph.: (0342) 559-088, 225-451
Th20The Hotel Complex of the CJSC "Prykarpattransgas"2006

Floor area: 200 sq. m

The repair and construction work fulfilled:

  • installation of floor cement covering;
  • wall and floor lining with ceramic tiles;
  • plasterboard works (walls, partitions);
  • installation of suspended ceilings from Armstrong tiles;
  • filling with putting, walls and ceiling painting;
  • laying of the internal systems of sewerage and water supply, weak-current circuits, internal systems of electricity and heating.
Performance time: six weeks.

7 Sichovyh Striltsiv str., Ivano-Frankivsk
ph.: (0342) 50-56-18
Th5Mortgage Center of the Regional Branch of "Privatbank" JSCB2007

Floor area: 40 sq. m

The repair and construction work fulfilled:

  • stretched ceiling structure erection;
  • exterior and interior finishing.

Th44Supermarket Favorit 2008

Floor area: 850 sq. m.

The repair and construction work fulfilled:

  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • installation of floor cement covering;
  • wall and floor lining with ceramic and ceramic granite tiles;
  • laying of internal systems of water supply, sewerage, internal systems of power supply and heating;
  • laying of internal systems of ventilation and air conditioning.
  • Performance time: 6 months

Th45branch office «Alfa-Bank»2007

Floor area: 1350 sq. m.

The repair and construction work fulfilled:

  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • installation of floor cement covering;
  • wall and floor lining with ceramic and ceramic granite tiles;
  • laying of internal systems of water supply, sewerage, internal systems of power supply and heating;
  • laying of internal systems of ventilation and air conditioning.
  • Performance time: 4 months.

Th46Branch office «Alfa-Bank»2007

Floor area: 1350 sq. m.

The repair and construction work fulfilled:

  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • installation of floor cement covering;
  • wall and floor lining with ceramic and ceramic granite tiles;
  • laying of internal systems of water supply, sewerage, internal systems of power supply and heating;
  • laying of internal systems of ventilation and air conditioning.
  • Performance time: 4 months.

Th51Branch office «Universalbank»2008

Floor area: 280 sq. m.

The repair and construction work fulfilled:

  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • installation of floor cement covering;
  • wall and floor lining with ceramic and ceramic granite tiles;
  • laying of internal systems of water supply, sewerage, internal systems of power supply and heating;
  • laying of internal systems of ventilation and air conditioning.
  • Performance time: 4 months

Th52Branch office «Universalbank»2008

Floor area: 320 sq. m.

The repair and construction work fulfilled:

  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • installation of floor cement covering;
  • wall and floor lining with ceramic and ceramic granite tiles;
  • laying of internal systems of water supply, sewerage, internal systems of power supply and heating;
  • laying of internal systems of ventilation and air conditioning.
  • Performance time: 5 months

Governmental enterprise "Karpatnaftokhim" (OJSC ‘Lukor’)
29 Robitnycha Str., Mostyshche village, Kalush region, Ivano-Frankivsk region
ph.: (03472) 66-4-60, 7-32-30
Th28Electromembrane process of caustic soda plant2010

Floor area: 6162 sq. m; total structural volume 113309 cubic metersm; capacity 200 thous. ton per year.

Employer: governmental enterprise "Karpatnaftokhim" (OJSC "Lukor").

The repair and construction work fulfilled:

  • earthwork operations;
  • installation of monolithic reinforced-concrete foundation;
  • installation of the tunnel at level -8,0;
  • installation of monolithic reinforced-concrete column, beam and floor systems assemblage of column, beam, truss metal structures;
  • installation of monolithic concrete manufacturing flooring.
Performance time: 9 months (October 2007 - June 2008).

Th33Suspended PVC manufacturing plant2010

Floor area: 5280 sq. m; total structural volume 9835 cubic meters; capacity 300 thous. ton per year;

Employer: governmental enterprise "Karpatnaftokhim" (OJSC "Lukor");

The repair and construction work fulfilled:

  • earthwork operations;
  • installation of monolithic reinforced-concrete foundation;
  • installation of monolithic reinforced-concrete column, beam and floor systems assemblage of column, beam, truss metal structures;
  • erection of 'sandwich' type wall panels;
  • installation of monolithic concrete manufacturing flooring.
Performance time: 6 months (June 2008 - November 2009).

18 Ploshcha Rynok str., Ivano-Frankivsk
ph.: (0342) 77-97-65
Th15Office Centre "Legenda-F"2009

Floor area: 1500 sq. m

The repair and construction work fulfilled:

  • earthwork operations;
  • assemblage of monolithic reinforced-concrete foundations;
  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • erection of brick walls and partitions;
  • assemblage of roofwork and woodwork constructions;
  • exterior and interior finishing;
  • laying of the internal systems of sewerage and water supply, weak-current circuits, internal systems of electricity and heating.
Performance time: six months.

MIA of Ukraine sanatorium ‘Kremintsi’
3 Puluya St., Tatariv village, Nadvirna district, Ivano-Frankivsk region
ph.: (03475) 35-412
Th19Sanatorium of MIA of Ukraine "Kremintsi"2007

Floor area: 300 sq. m

The repair and construction work fulfilled:

  • installation of floor cement covering;
  • wall and floor lining with ceramic and ceramic granite tiles;
  • plasterboard works (walls, partitions);
  • installation of suspended ceilings from Armstrong tiles;
  • filling with putting, walls and ceiling painting;
  • laying of internal systems of water supply, sewerage, internal systems of power supply and heating.
Performance time: six weeks.

77 Chervonoarmiyska Str., Chernivtsi
ph.: (0372) 53-45-99
Th10The Regional Branch of OJSC Incorporate Bank "Ukrgasbank"2006

Floor area: 2000 sq. m

The repair and construction work fulfilled:

  • installation of floor cement covering;
  • wall and floor lining with ceramic tiles;
  • plasterboard works (walls, partitions);
  • installation of suspended ceilings from Armstrong tiles;
  • filling with putting, walls and ceiling painting;
  • laying of internal systems, power supply, water supply, sewerage and heating.
Performance time: four months.

Th41Supermarket Favorit 2007

Floor area: 2500 sq. m.

The repair and construction work fulfilled:

  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • installation of floor cement covering;
  • wall and floor lining with ceramic and ceramic granite tiles;
  • laying of internal systems of water supply, sewerage, internal systems of power supply and heating;
  • laying of internal systems of ventilation and air conditioning.
  • Performance time: 6 months

Th43Supermarket Favorit 2008

Floor area: 1350 sq. m.

The repair and construction work fulfilled:

  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • installation of floor cement covering;
  • wall and floor lining with ceramic and ceramic granite tiles;
  • laying of internal systems of water supply, sewerage, internal systems of power supply and heating;
  • laying of internal systems of ventilation and air conditioning.
  • Performance time: 7 months

Th54Ремонт машзала КС Тернополь, галереи нагнитавачев.2012

Общая площадь 2615 м2

Выполненные ремонтно-строительные работы:

  • устройства промышленных бетонных полов;
  • гипсокартонные работы (стены, перегородки);
  • шпатлевка и покраска стен и потолка;
  • облицовки наружных стен металлопрофилем; устройства наборной сэндвич-панели
  • кладки стен и перестинки кирпичом;
  • замена старых деревянных окон на энергосберегающие окна.

    Срок выполнения - 3 месяца.

Th55Капремонт кровли и внешней отделки АРП (аварийно-ремонтного пункта) Ровенского ЛПУМГ.2012

Общая площадь 1700 м2

Выполненные ремонтно-строительные работы:

  • кладки стен и перегородок из кирпича;
  • устройства цементных стяжек полов;
  • устройство шатровой крыши;
  • Отделка и утепление фасада;
  • Усиление наружных стен;
  • Замена старых деревянных окон на энергосберегающие

    Срок выполнения - 4 месяца.

PE "Polex Plus"
198-А Rus’ka St., Chernivtsi
ph.: (0372) 73-56-78
Th12Office and Shopping Center2008

Floor area: 3500 sq. m

The repair and construction work fulfilled:

  • installation of monolithic reinforced-concrete foundation;
  • installation of monolithic reinforced-concrete column, beam and floor systems.
Performance time: 7 months (October 2007 – April 2008).

Th14Shopping Center "Polex" 2008

Floor area: 1900 sq. m

The repair and construction work fulfilled:

  • earthwork operations;
  • installation of monolithic reinforced-concrete foundation;
  • installation of monolithic reinforced-concrete column, beam and floor systems;
  • construction of brickwork, brick walls, partitions;
  • assemblage of roofwork and woodwork constructions;
  • exterior and interior finishing;
  • laying of the internal systems of sewerage and water supply, weak-current circuits, internal systems of electricity and heating.
Performance time: six months.

PE Arsen V.
7 Tychyny St., Ivano-Frankivsk
ph.:
Th29Shopping center 2007

Floor area: 2500 sq. m.

The repair and construction work fulfilled:

  • earthwork operations;
  • assemblage of monolithic foundations;
  • assemblage of monolithic floor structures;
  • construction of brickwork, brick walls, partitions.
Performance time: six months.

PE Synytsa S.
17 Ivana Franka Str., Polyanytsya village, Nadvirna district, Ivano-Frankivsk region
ph.: (03475) 37-785
Th23Sanatorium "Polyanytsya"2006

Floor area: 1500 sq. m

The repair and construction work fulfilled:

  • installation of floor cement covering;
  • wall and floor lining with ceramic and ceramic granite tiles;
  • plasterboard works (walls, partitions);
  • installation of suspended ceilings from Armstrong tiles;
  • filling with putting, walls and ceiling painting;
  • laying of internal systems of water supply, sewerage, internal systems of power supply and heating.
Performance time: three months.

State Tax Inspectorate of Yaremche town
226 Svobody Str., Yaremche, Nadvirna district, Ivano-Frankivsk region
ph.: (03434) 2-14-42
Th36State Tax Inspectorate 2009

Floor area: 1150 sq. m

The repair and construction work fulfilled:

  • earthwork operations;
  • assemblage of monolithic foundations;
  • assemblage of monolithic floor structures;
  • construction of brickwork, brick walls, partitions.
Performance time: sixteen months.

The Central Municipal Lab of Sanitary and Veterinary Expertise
23 Novgorodska St., Ivano-Frankivsk
ph.: (0342) 55-32-15
Th16The Central Municipal Lab of Sanitary and Veterinary Expertise2007

Floor area: 1500 sq. m

The repair and construction work fulfilled:

  • installation of floor cement covering
  • wall and floor lining with ceramic tiles
  • plasterboard works (walls, partitions)
  • installation of suspended ceilings from Armstrong tiles
  • filling with putting, walls and ceiling painting
  • laying of the internal systems of sewerage, water supply as well as internal systems of electrical supply
Performance time: six months

Town Center
7 Strachenykh Str., Yaremche, Nadvirna district, Ivano-Frankivsk region
ph.: (03434) 21-589
Th17Town Centre of Employment2006

Floor area: 1500 sq. m

The repair and construction work fulfilled:

  • installation of floor cement covering;
  • wall and floor lining with ceramic tiles;
  • plasterboard works (walls, partitions);
  • installation of suspended ceilings from Armstrong tiles;
  • filling with putting, walls and ceiling painting;
  • laying of internal systems of water supply, sewerage, internal systems of power supply and heating.
Performance time: four months.

© 2006—2011 Energobud